Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

USGS 01104420 CAMBRIDGE RES., UNNAMED TRIB 3, NR LEXINGTON, MA

PROVISIONAL DATA SUBJECT TO REVISION

Click to hidestation-specific text
LOCATION--Middlesex County, Hydrologic Unit 01090001, on right bank, 20 feet downstream of culvert on State Highway 128, 1,700 feet upstream of Cambridge Reservoir, and 2.5 mi. southwest of Lexington.
DRAINAGE AREA--0.77 mi2.
PERIOD OF RECORD--September 1997 to September 1998; November 2011 to current year.
GAGE--Data Collection Platform with telephone telemeter. Datum of gage is 179.20 ft above NAVD 1988, estimated from topographic map.
COOPERATION BY--Cambridge Water Department

This station managed by the Northborough, MA Field Office.  
Available Parameters Period of Record
  
2012-03-26  2024-11-28
1997-10-01  2024-11-28
2012-03-26  2024-11-28







 (365)
 

  -- or --

 


 

Summary of all available data for this site
Instantaneous-data availability statement


Temperature, water, degrees Celsius, 25ft Downstream of pier


Graph of DAILY Temperature, water, degrees Celsius

Add up to 2 more sites and replot for "Temperature, water, degrees Celsius, 25ft Downstream of pier"

?
 


Create presentation-quality graph.  


Discharge, cubic feet per second


Graph of DAILY Discharge, cubic feet per second

Add up to 2 more sites and replot for "Discharge, cubic feet per second"

?
 


Create presentation-quality graph.  


Specific conductance, water, unfiltered, microsiemens per centimeter at 25 degrees Celsius, 25ft Downstream of pier


Graph of DAILY Specific conductance, water, unfiltered, microsiemens per centimeter at 25 degrees Celsius

Add up to 2 more sites and replot for "Specific conductance, water, unfiltered, microsiemens per centimeter at 25 degrees Celsius, 25ft Downstream of pier"

?
 


Create presentation-quality graph.